Major repairs of a general-education school №12

Project description:
Major repairs of a general-education school №12, for over 450 students in Mingachevir city, Azerbaijan
Start of works:
12 November 2020
Completion of works:
30 December 2021
Employer:
The Capital Construction and Supply Department of the Ministry of Education of Azerbaijan
Address:
Azerbaijan Republic, Baku, Bakuvi street, 18
Total Contract Amount:
1 534 227 €
Description of the main works:

Installation of internal engineering networks, energy saving system, design works, works on operational buildings, insulation of walls, roofs and basements.

– Insulation of walls, roofs and basements – 4678 m2

– Replacement of openings – 330 m2

– Replacement of lightings with LED – 408 pcs.

Role:
General Contractor

Location: Mingachevir, Azerbaijan